Type of Request
*
Partial/One Lane Closure
Full Road Closure
Right-Of-Way Work
Sidewalk
Application Number & Descriptions
*
Please select an application.
Select an application...
TA-1 - Work Beyond the Shoulder
TA-2 - Blasting Zone
TA-3 - Work on Shoulders
TA-4 - Short Duration or Mobile Operation on Shoulder
TA-5 - Shoulder Closure on Freeway
TA-6 - Shoulder Work with Minor Encroachment
TA-7 - Road Closed with Diversion
TA-8 - Roads Closed with Off-Site Detour
TA-9 - Overlapping Routes with Detour
TA-10 - Lane Closure on Two-Lane Road Using Flaggers
TA-11 - Lane Closure on Two-Lane Road with Low Traffic Volumes
TA-12 - Lane Closure on Two-Lane Road Using Traffic Control Signals
TA-13 - Temporary Road Closure
TA-14 - Haul Road Crossing
TA-15 - Work in Center of Road with Low Traffic Volumes
TA-16 - Surveying Along Centerline of Road with Low Traffic Volumes
TA-17 - Mobile Operations on Two-Lane Road
TA-18 - Lane Closure on Minor Street
TA-19 - Detour for One Travel Direction
TA-20 - Detour for Closed Street
TA-21 - Lane Closure on Near Side of Intersection
TA-22 - Right Lane Closure on Far Side of Intersection
TA-23 - Left Lane Closure on Far Side of Intersection
TA-24 - Half Road Closure on Far Side of Intersection
TA-25 - Multiple Lane Closures at Intersection
TA-26 - Closure in Center of Intersection
TA-27 - Closure at Side of Intersection
TA-28 - Sidewalk Closures and Bypass Sidewalks
TA-29 - Crosswalk Closures and Pedestrian Detours
TA-30 - Interior Lane Closure on Multi-lane Street
TA-31 - Lane Closure on Street with Uneven Directional Volumes
TA-32 - Half Road Closure on Multi-lane, High-Speed Highway
TA-33 - Lane Closure on Divided Highway
TA-34 - Lane Closure with Temporary Traffic Barrier
TA-35 - Mobile Operation on Multi-lane Road
TA-36 - Lane Shift on Freeway
TA-37 - Double Lane Closure on Freeway
TA-38 - Interior Lane Closure on Freeway
TA-39 - Median Crossover on Freeway
TA-40 - Median Crossover for Entrance Ramp
TA-41 - Median Crossover for Exit Ramp
TA-42 - Work in Vicinity of Exit Ramp
TA-43 - Partial Exit Ramp Closure
TA-44 - Work in Vicinity of Entrance Ramp
TA-45 - Temporary Reversible Lane Using Movable Barriers
TA-46 - Work in Vicinity of Highway-Rail Grade Crossing
Unknown
Road
*
Road name is required.
From
To
Please mark the work area on the map below. Click on the map to start drawing a line.
Please select one or more locations.
Geocoding control
Start Date
*
Start date is required.
End Date
*
End date is required.
Start Time
12:00am
12:30am
1:00am
1:30am
2:00am
2:30am
3:00am
3:30am
4:00am
4:30am
5:00am
5:30am
6:00am
6:30am
7:00am
7:30am
8:00am
8:30am
9:00am
9:30am
10:00am
10:30am
11:00am
11:30am
12:00pm
12:30pm
1:00pm
1:30pm
2:00pm
2:30pm
3:00pm
3:30pm
4:00pm
4:30pm
5:00pm
5:30pm
6:00pm
6:30pm
7:00pm
7:30pm
8:00pm
8:30pm
9:00pm
9:30pm
10:00pm
10:30pm
11:00pm
11:30pm
End Time
12:00am
12:30am
1:00am
1:30am
2:00am
2:30am
3:00am
3:30am
4:00am
4:30am
5:00am
5:30am
6:00am
6:30am
7:00am
7:30am
8:00am
8:30am
9:00am
9:30am
10:00am
10:30am
11:00am
11:30am
12:00pm
12:30pm
1:00pm
1:30pm
2:00pm
2:30pm
3:00pm
3:30pm
4:00pm
4:30pm
5:00pm
5:30pm
6:00pm
6:30pm
7:00pm
7:30pm
8:00pm
8:30pm
9:00pm
9:30pm
10:00pm
10:30pm
11:00pm
11:30pm
Road closure end date must be greater than the start date.
Applicant
*
Applicant is required.
Email
*
Email address is required.
Your email address is invalid.
On-Site Contact
*
Contact is required.
Phone Number
Use correct format 999-999-9999
Work to Be Performed
*
Work performed is required.
Reason for Closure
*
Reason for closure is required.
NOTE:
Application will not be approved without adequate Traffic Control Plan submitted with application.
Items / Information provided by applicant (per M.U.T.C.D. requirements)
Photo size limit 5 MB total.
Traffic Control Plan
Only jpg, doc, docx, xls, xlsx, or pdf files are allowed!
Detour Plan
Only jpg, doc, docx, xls, xlsx, or pdf files are allowed!
Barricades, Signs, Flashers, or other Signage Details
Only jpg, doc, docx, xls, xlsx, or pdf files are allowed!
Design specifications, and details per GA DOT for paving, road cuts
Only jpg, doc, docx, xls, xlsx, or pdf files are allowed!
Lane Closure / Partial Lane Closure Requirements
You agree to release, indemnify and hold harmless the city of Marietta from any liability for personal injuries or property damage sustained by any person in connection with any activities for which this permission is issued.
You agree to comply with the rules and regulations provided in the U.S. Department of Transportation Manual on Uniform Traffic Control Devices for Streets and Highways (M.U.T.C.D.) latest edition.
You are to provide a traffic control plan for the section of road to be partially closed that meets the city of Marietta requirements. Note on the plans any circumstances that may require special attention.
Partial road closures are allowed only between 9 a.m. and 4 p.m. Monday through Friday. Between closures, the road shall be replaced per city of Marietta standards. Per city ordinance, "Construction and demolition activity or the excavation of streets and highways within 1,000 feet of any residential district or section
shall not be performed between the hours of 7 p.m. and 7 a.m. with the exception of all of Sunday."
(see Chapter 10-6, Noise; Ordinance 6854, signed September 14, 2005 for specific requirements)
All flaggers must be certified.
All Type 1 and Type 2 barricades shall have a minimum of one warning light (flasher) per barricade. All Type 3 barricades shall have a minimum of two warning lights (flashers) per barricade.
Attach plan of detour, details, sign locations, etc.
All signs are to be installed per the M.U.T.C.D.
It is your responsibility to install and maintain all signs, barricades, flashers, etc. in strict accordance with the requirements of the city of Marietta. You further understand that the city's Department of Public Works may suspend construction for any failure on your part to meet the above requirements.
A
copy of this approval and traffic control plan during the closure must be on the site.
Requirements for road cuts and pavement replacement with the city of Marietta:
For city roads on latest city map, install a
concrete ditch cap
immediately following installation of pipe / crossing ditch work (see detail "typical street cut repair"). Road must be available for travel at end of work day.
High early strength concrete may be used. Steel plate per GA DOT specifications, pinned to anchor, must be installed temporarily. Asphalt paving must be installed within 96 hours for local roads. Asphalt paving must be installed within 48 hours for arterial or collector roads. GA DOT or Cobb County approval for state and / or county roads.
Requirements Agreement
*
I have read and understand the requirements above.
You must agree to the terms above to submit this application.